System integration done-for-you: a fully operational E-House in 6–12 months
In 68 seconds: how we assemble the E-House w/ Dan Brown, Senior Project Engineer, based in Chicago
We pay for everything
Assemble the E-House(s)
Commission PLC programming
Setup + motor calibration
Validate + enable
Your input: About one* week of on-site help once we’re ready to commission.
*For complex systems this can stretch to a month.
While not a big innovation, having a bypass removes any risk of downtime if something fails in the E-House.
Even more important than savings, we make sure our involvement never adds any risk to production.

1
Ease
Fully automated
2
Safety
Motorized switching
3
Agility
Flip between VFD/DOL
4
Power
Voltages up to 13.8kV





Client time-to-savings reduced by a year.
This phase, including contracting all parties, takes 6 to 12 months.