System integration done-for-you: a fully operational E-House in 6–12 months

In 68 seconds: how we assemble the E-House w/ Dan Brown, Senior Project Engineer, based in Chicago

We pay for everything

Assemble the E-House(s)

Commission PLC programming

Setup + motor calibration

Validate + enable

Your input: About one* week of on-site help once we’re ready to commission.

*For complex systems this can stretch to a month.

While not a big innovation, having a bypass removes any risk of downtime if something fails in the E-House.

Even more important than savings, we make sure our involvement never adds any risk to production.

1

Ease

Fully automated

2

Safety

Motorized switching

3

Agility

Flip between VFD/DOL

4

Power

Voltages up to 13.8kV

Client time-to-savings reduced by a year.

This phase, including contracting all parties, takes 6 to 12 months.

Once live, we manage the motor performance SLA