Intelligent*
Motor Control

for large fans and pumps in mining and metals

*technical expertise + AI

see the team

️90MW

motors currently under control

43%

avg. energy efficiency

reduce production downtime

54

e-houses deployed

Energy efficiency as-a-service

Zero-CapEx Intelligent Motor Control

Assessment to guaranteed savings in <18 months:

01

Go/no go: <30 days

Feasibility
assessment

02

New account: 3–6 months
Expansion: <45 days

System design
+ contracting

03

Operational E-House
in 6–12 months

System integration

04

Contract SLA: 10 years
After: reduced fee SLA
or buy the E-House

E-House buy-out option in month 13

Motor performance

Keynote by Paul Wrighton, Energy Drive
Feat. Andrea Ruotolo, Rockwell Automation
Automation Fair, Los Angeles 2024

Optimizing energy spend on large motors

watch 13:03

10-day actual client fan example

Engineering
& electrical

We combine expertise & models of similar MV motor control systems, incl. design, assembly, integration, and maintenance.

Your staff remains in production.

01

Production uptime

E-Houses are installed w/ a fully motorized bypass—zero risk of unplanned downtime.

02

Measurement
& verification

Consumption recorded w/ sealed Energy Meter. Compared to a 3rd party baseline to verify savings.

03